missing translation for 'onlineSavingsMsg'
Learn More

Unity Lab Services™ Thermo Scientific™ Water Purification Validation Service for Thermo Scientific™ Barnstead GenPure, all models

Stay compliant with our Industry-Exclusive, No-Charge Requalification Guarantee included with each Thermo Scientific Water Purification Validation Service for Thermo Scientific Barnstead GenPure, all models

Merk:  Unity Lab Services™ IOQPCKE50133917

Produktcode. 15631589

  • 1993.00 / 1 stuk

om dit product te kopen Registreer vandaag om een webaccount aan te maken

Explore more special offers
This item is not returnable. View return policy

Beschrijving

Beschrijving

IQ

  • Verifies that the equipment, manuals, supplies and any other accessories arrived undamaged as specified in the sales order. Verifies equipment is assembled and installed and any initial diagnostics tests have been performed. Any abnormal event(s) observed during assembly and installation have been documented.
  • Utility, Facility and Environment Verifies that the installation site satisfactorily meets manufacturer-specified environmental requirements.

OQ

  • System Component Information Detailed configuration information for each system component have been recorded.
  • OQ Limits: Record a list of manufacturer recommended limits for ensuring that the system is operating as expected.
  • Equipment Operational Tests and Results: Test important equipment functions to verify that the equipment operates as intended by the manufacturer and required by the user. This is a group of selected important equipment parameters for testing according to the intended use of the equipment.

Key Tests: Flow Adjustment, Water Pressure, Resistivity, Power Failure

TRUSTED_SUSTAINABILITY
Specificatie

Specificatie

Thermo Scientific Water Purification including Thermo Scientific Barnstead GenPure, all models
Validation (IQ/OQ) includes a standardized protocol procedure, IQ: Verify Installation and environmental conditions, OQ: Verify operation to design specification, Flow Adjustment, Water Pressure, Resistivity, Power Failure testing.
Contact your local sales representative for a list of standard and extended coverage areas.
Travel to major metropolitan areas. Does not include Installation. Instrument must be installed, powered-up and set temperature point for 24 hours before on-site service
Product Suggestions

Product Suggestions

Video's
SDS
Documentatie

Documentatie

Certificates
Bekijk bijbehorende artikelen
Speciale aanbiedingen

Speciale aanbiedingen

Product Content Correction

Your input is important to us. Please complete this form to provide feedback related to the content on this product.

Product Title

By clicking Submit, you acknowledge that you may be contacted by Fisher Scientific in regards to the feedback you have provided in this form. We will not share your information for any other purposes. All contact information provided shall also be maintained in accordance with our Privacy Policy.

Thank You! Your feedback has been submitted. Fisher Scientific is always working to improve our content for you. We appreciate your feedback.